Description
The MOCVD Susceptor for Epitaxial Growth by semicera, a leading solution designed to optimize the epitaxial growth process for advanced semiconductor applications. Semicera's MOCVD Susceptor ensures precise control over temperature and material deposition, making it the ideal choice for achieving high-quality Si Epitaxy and SiC Epitaxy. Its robust construction and high thermal conductivity enable consistent performance in demanding environments, ensuring the reliability required for epitaxial growth systems.
This MOCVD Susceptor is compatible with various epitaxial applications, including the production of Monocrystalline Silicon and the growth of GaN on SiC Epitaxy, making it an essential component for manufacturers seeking top-tier results. Additionally, it works seamlessly with PSS Etching Carrier, ICP Etching Carrier, and RTP Carrier systems, enhancing process efficiency and yield. The susceptor is also suitable for LED Epitaxial Susceptor applications and other advanced semiconductor manufacturing processes.
With its versatile design, semicera's MOCVD susceptor can be adapted for use in Pancake Susceptors and Barrel Susceptors, offering flexibility in different production setups. The integration of Photovoltaic Parts further broadens its application, making it ideal for both semiconductor and solar industries. This high-performance solution delivers excellent thermal stability and durability, ensuring long-term efficiency in epitaxial growth processes.
Main Features
1 .High purity SiC coated graphite
2. Superior heat resistance & thermal uniformity
3. Fine SiC crystal coated for a smooth surface
4. High durability against chemical cleaning
Main Specifications of CVD-SIC Coatings:
SiC-CVD | ||
Density | (g/cc) | 3.21 |
Flexural strength | (Mpa) | 470 |
Thermal expansion | (10-6/K) | 4 |
Thermal conductivity | (W/mK) | 300 |
Packing and Shipping
Supply Ability:
10000 Piece/Pieces per Month
Packaging & Delivery:
Packing:Standard & Strong Packing
Poly bag + Box + Carton + Pallet
Port:
Ningbo/Shenzhen/Shanghai
Lead Time:
Quantity(Pieces) | 1 – 1000 | >1000 |
Est. Time(days) | 30 | To be negotiated |